Page 4 - Fireball

Basic HTML Version

4.
REGULAR BALL TO BALL SEQUENCE OF OPERATION:
, tA. When the "1st ball" is played, the "ball index relay- will
be energized by the -10 point-, -100 point" or nlOOO point-
score relay and it stays energized thru its own hold in
switch, (normally closed) -player reset relay" switch and
(normally closed) "player up unit- end of stroke switch.
lB. If the ball in play goes into the "Wotan hole" or the
·Odin hole", another ball is released to shooter alley and
the "same player" continues playing. (Note: Balls in both
Wotan and Odin holes will release a ~rd ball to shooter alley).
If the ball in play goes into the outhole, it will energize
the "outhole relay" thru (Normally closed) #1 score motor
switch, and it stays energized thru i~.own hold-in switch
and (normally closed) #10 score motor switch.
lC. The outhole relay operates the score motor and thru (normally
open) #4 score motor switch will energize the "outhole kicker
solenoidn, and it will kick the ball from outhole into ball
trough.
-
lD. When more than one ball
1S
active on playfield, the last ball
in motion becomes the "ball in play·. If it goes into the
"Wotan hole· or -Odin hole"6 another ball is released to
.hooter alley and -same play.r- continues playing. If it
goes into the outhole, the outhole relay is energized, which
in series with "ball trough switches· and/or -Wotan hole relay
switches" and/or ·Odin hole relay switches", will energize the
·3rd ball relay" and it stays energized thru its own hold-in
switch and (normally closed) #6 score motor switch. When
the outhole relay is de-energized, the "ball release relay"
will be energized thru the same series of ball trough switches,
the ·Wotan hole- relay switches, "Odin hole· relay switches
that energized the 3rd ball relay, and it stays-energized thru
its own hold-in switch and (normally closed) #6 score motor
switch. In normal ball to ball play (depending on -single or
Ilmultiple" players) the combination of 3rd ball relay and
ball release relay switches will either advance the "ball
count unit" and reset the "player up unit IIor advance the
·player up unitll, thru (normally open) #3 and/or #4 score
motor switches and ·player reset relay".
lEe When the last eligible player's final ball returns to the out-
hole, the final advance of the ball count unit will in turn
energize the "game over interlock relay trip coil" and the
game is completed.
Note: Normal ball to ball sequence of operation is interrupted when
a "tilt" occurs. A "tilt relay switch" will bypass the 3rd ball
relay and ball index relay switches to advance the ball count unit
and reset the player up unit or advance the player up unit. When
a tilt occurs, any captive ball in ·Wotan hole" or "Odin hole"
remains captive.