We will have a production update from CGC expected today, but my input from talking with Stern last week was they were loading the line with parts last week, so that is good news and then they just need to insure things are ready to go. "Production" includes both assembly production and then main production - and likely assembly production starts first and then playfields go down the line a very short time later.
PPS has started interlocking with CGC on Trim color production as well as allocation to resellers for games - we have an initial allocation of the games for the first batch and will be reviewing and then sending updates to the resellers for them to get in line.
For the first batch of games Gold and some Black will be made
Rick